Nitoflor SL2000 Product Description
Nitoflor SL2000 is designed for a wide range of industrial environments where a permanent solution to floor maintenance problems is required. It provides a dense, impermeable, colored, and chemically resistant surface that is hygienic and easy to clean. Typical applications include:
Applications (Uses)
Nitoflor SL2000 is designed for a wide range of industrial environments requiring a flooring system that provides a long-term solution to floor maintenance problems.
The product creates a high-density, impermeable, colored, and chemically resistant surface that is hygienic and easy to clean.
Typical application areas include:
Clean Rooms
Laboratories
Kitchens
Plant Rooms
Light Industrial Plants
Product Advantages (Advantages)
Fast Application – Reduces downtime and allows treated areas to return to service more quickly
Chemically Resistant – Provides resistance to a wide range of chemicals
Durable – Offers excellent abrasion resistance
Hygienic – Creates a dense, impermeable, seamless surface that is easy to clean
Attractive – Available in a wide range of colors to enhance the appearance and functionality of working environments
Product Description (Description)
Nitoflor SL2000 consists of graded aggregates bound together with a pigmented epoxy resin binder.
The product is supplied as a four-component system, with all components factory pre-measured in the correct proportions, ready for on-site mixing and application.
Once installed, Nitoflor SL2000 provides a smooth, light-reflective surface finish and is available in a variety of standard colors.
Product Specification (Specification)
Flow-Applied Epoxy Floor Topping
The specified flooring system shall be Nitoflor SL2000, a flow-applied epoxy resin floor topping installed at a thickness of 2 mm.
The flooring system shall achieve a compressive strength of 50 N/mm² and a flexural strength of 34 N/mm² when tested at 7 days in accordance with BS 6319.
At a temperature of 20°C, the flooring system shall be ready for service within the following periods:
Foot Traffic: 24 hours after installation
Vehicular Traffic: 48 hours after installation












